Pricing

Fixed pricing for Extension Design & Planning and Building Regulations. You'll receive a clear quotation before instruction, with statutory fees and any third-party costs identified separately where applicable.

Stage 1

Extension Design & Planning

From first consultation through design, planning application and liaison with the Local Planning Authority to decision.

Single Storey Extension

Rear extension, side extension

From £895

Fixed fee — confirmed before we start

  • Initial consultation
  • Measured survey coordination — survey costs quoted separately
  • Existing floor plans
  • Proposed floor plans
  • Proposed elevations
  • Location/site plans where required
  • Extension design development
  • Basic external 3D image where useful
  • Up to two rounds of design amendments
  • Planning application preparation
  • Planning Portal submission
  • LPA liaison to decision

Side & Rear / Wraparound

Combined side and rear, L-shaped extensions

From £1,095

Fixed fee — confirmed before we start

  • Everything in Single Storey
  • Combined side and rear design
  • Coordinated roof and drainage design

Double Storey Extension

Two-storey rear or side extensions

From £1,295

Fixed fee — confirmed before we start

  • Everything in Single Storey
  • Ground and first floor layout design
  • Two-storey elevation design
Measured surveys: Measured surveys can be arranged throughout England & Wales. Survey costs are quoted separately depending on the property and location, and are not included in the package prices above.
Stage 2 — Separate Service

Building Regulations & Technical Design

Quoted and carried out after planning approval. Not automatically included in the planning package.

Single Storey

Building Regulations drawings for single storey extensions

From £595

Fixed fee — confirmed in quotation

Double Storey

Building Regulations drawings for two-storey extensions

From £895

Fixed fee — confirmed in quotation

Structural engineering and specialist reports

Structural engineering calculations are quoted separately as they vary significantly by project. Where specialist reports (drainage, geotechnical, etc.) are required, costs are confirmed before any work is instructed.

Not included in either package unless specifically confirmed

  • •Planning authority application fees (paid directly to your LPA)
  • •Building Control fees (paid to Local Authority Building Control or a Registered Building Control Approver)
  • •Structural engineering calculations (quoted separately per project)
  • •Drainage surveys and drainage design
  • •Party Wall services
  • •Specialist reports required for the application or construction
  • •Major redesign following a planning refusal
  • •Planning appeals

Get a fixed quotation

Prices above are starting points. Tell us about your project and we will confirm a fixed fee before any work begins.